Project handbook
The project handbook is prepared by the contractor and sets out responsibilities, procedures, and lines of communication for construction. This is a separate document to the construction phase plan which is a requirement of the CDM regulations and relates only to health and safety.
The project handbook might include:
- A comprehensive project directory listing relevant personnel, e-mail and postal addresses and telephone numbers and describing their role in the project.
- Contractor organisation charts, identifying roles and responsibilities.
- Lists of third parties including: stakeholders, statutory authorities, statutory utilities, adjacent property owners and occupants, emergency services and any other local or national bodies with an interest in the project.
- Personnel to deal with media relations and complaints.
- Head office and site operating procedures (such as purchasing arrangements and PAYE arrangements).
- Valuation dates for measurement, off-site inspections and payment.
- Meetings schedules and reporting systems.
- Records, archiving and document control strategies (including archiving strategy and security against fire or theft).
- Document distribution procedures.
- Site instructions and change order procedures.
- Cost control and reporting.
- Programme reporting and adjustment procedures.
- Commissioning and handover procedures.
[edit] Related articles on Designing Buildings Wiki.
Featured articles and news
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Many resources for visitors aswell as new features for members.
Using technology to empower communities
The Community data platform; capturing the DNA of a place and fostering participation, for better design.
Heat pump and wind turbine sound calculations for PDRs
MCS publish updated sound calculation standards for permitted development installations.
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.
Heritage staff wellbeing at work survey.
A five minute introduction.
50th Golden anniversary ECA Edmundson apprentice award
Showcasing the very best electrotechnical and engineering services for half a century.
Welsh government consults on HRBs and reg changes
Seeking feedback on a new regulatory regime and a broad range of issues.
CIOB Client Guide (2nd edition) March 2025
Free download covering statutory dutyholder roles under the Building Safety Act and much more.